# Kanban board

- Framework: [Kanban](https://pmdecoder.com/en/framework/kanban/)
- Reference: Kanban Guide 2025.5, Abschnitt Defining and Visualizing the Workflow
- Edition: The Kanban Guide, May 2025
- Canonical version: https://pmdecoder.com/en/glossary/kanban-board/

## Definition

According to the Kanban Guide, the Kanban board is the visualization of the Definition of Workflow. At a minimum it shows its basic elements: which work items there are, where they start and end, which states they pass through, how work in progress is limited, which policies apply and which Service Level Expectation is aimed for. This transparency is the basis for managing and improving the workflow well. The Guide does not prescribe what a board looks like. Columns for states and cards for items, on a wall or in a tool, are common; other forms are equally possible as long as they make the flow understandable.

## Equivalents in other frameworks

No equivalents have been recorded for this term yet.

## Classification

- Broader term: [Kanban practices](https://pmdecoder.com/en/glossary/kanban-practices/)

## Distinction

A task board with the columns "to do, in progress, done" is not yet a Kanban board in the sense of the Guide if limits, policies and start and end points are missing. The Sprint Backlog in Scrum is often displayed in a similar way but relates to one Sprint. In manufacturing, kanban cards control replenishment; a board in today's sense is not needed for that.

## In practice

A facility management team maps its jobs on a whiteboard: incoming, scheduled, on site, waiting for materials, completed. Above "on site" is the number 6 as a limit; in the margin are the rules for emergencies and the statement that 80 percent of jobs should be completed within five days. Red magnets mark blocked jobs. In the weekly meeting, the team immediately sees that the "waiting for materials" column is filling up.

## Frequently asked questions

### Does a Kanban board have to be digital?

No. The Kanban Guide leaves the form open. What matters is that the Definition of Workflow is visible to everyone and up to date.

### Is a board enough to apply Kanban?

No. The board is only the visualization. Kanban also includes actively managing the work, improving the workflow and the flow metrics.

## Related terms

- [Definition of Workflow](https://pmdecoder.com/en/glossary/definition-of-workflow/)
- [Explicit policies](https://pmdecoder.com/en/glossary/explicit-policies/)
- [Sprint Backlog](https://pmdecoder.com/en/glossary/sprint-backlog/)

---

Independent information service. Not published, reviewed or authorized by ISO, PMI or the publishers of the other frameworks. The original text is authoritative in each case.