# Just-in-time

abbr. JIT

- Framework: [Lean](https://pmdecoder.com/en/framework/lean/)
- Canonical version: https://pmdecoder.com/en/glossary/just-in-time/

## Definition

Just-in-time aims to ensure that materials, parts or information arrive at the next point neither too early nor too late and not in excessive quantities. This reduces inventories, storage space and the time during which defects remain undetected. The means to this end are the pull principle, small batch sizes, production paced to the takt time and levelled production. Just-in-time was developed at Toyota, above all under Taiichi Ohno, and together with autonomation forms the two supporting pillars of the Toyota Production System. Because buffers are missing, just-in-time makes disruptions visible immediately.

## Equivalents in other frameworks

No equivalents have been recorded for this term yet.

## Classification

- Broader term: [Toyota Production System](https://pmdecoder.com/en/glossary/toyota-production-system/)

## Distinction

The pull principle is a means, just-in-time the goal to which it contributes. Just-in-sequence goes further and additionally delivers parts in the order in which they are installed. In purchasing, just-in-time is sometimes reduced to a delivery arrangement in which suppliers take over the customer’s warehouse; this only partly captures the idea, because just-in-time concerns the entire value stream.

## In practice

On an inner-city construction site without storage space, the site management agrees with the facade contractor that the elements will be delivered floor by floor and in installation order, each on the day before installation. Delivery is linked to installation progress. This keeps the access road clear, no elements are damaged by intermediate storage, and delays become apparent immediately because no stock hides them.

## Frequently asked questions

### Does just-in-time make a supply chain more vulnerable?

It can, because buffers are missing. Just-in-time therefore requires stable processes and reliable partners, and in practice it is often combined with targeted safety stocks for critical parts.

### Is there just-in-time in services as well?

Yes. The idea can be transferred to information, for example when documents are only prepared when they are needed for the next decision.

## Related terms

- [Pull principle](https://pmdecoder.com/en/glossary/pull-principle/)
- [Autonomation](https://pmdecoder.com/en/glossary/autonomation/)
- [Production levelling](https://pmdecoder.com/en/glossary/production-levelling/)
- [Takt time](https://pmdecoder.com/en/glossary/takt-time/)
- [Muda](https://pmdecoder.com/en/glossary/muda/)

---

Independent information service. Not published, reviewed or authorized by ISO, PMI or the publishers of the other frameworks. The original text is authoritative in each case.
