# Improve phase

- Framework: [Six Sigma](https://pmdecoder.com/en/framework/six-sigma/)
- Reference: ISO 13053-1:2011
- Edition: ISO 13053-1:2011 (DMAIC methodology)
- Canonical version: https://pmdecoder.com/en/glossary/improve-phase/

## Definition

In the Improve phase the team develops solutions that address the causes confirmed in the analysis. It gathers ideas, assesses them by effect, effort and risk and selects the most promising. Possible new failure sources of the planned solution are examined in advance, often with an FMEA. Before a solution is rolled out widely, it is piloted in a limited area and its effect is demonstrated with the same measures as in the Measure phase. Only when the pilot shows the expected improvement does the introduction follow, with training, revised work instructions and technical changes where needed. The tollgate checks whether the project goal has been reached.

## Equivalents in other frameworks

No equivalents have been recorded for this term yet.

## Classification

- Broader term: [DMAIC](https://pmdecoder.com/en/glossary/dmaic/)

## Distinction

The Improve phase is not a general collection of ideas: solutions must relate to confirmed causes and show their effect with data. It differs from the Control phase in that it brings about the improvement, while the Control phase secures it for the long term. In Design for Six Sigma its place is taken by the design of a new solution.

## In practice

An energy supplier has found that late meter readings cause billing errors. The team develops automatic transmission by the fitters via an app and a block that holds back bills without a final meter reading. Both are piloted for eight weeks in one region; the error rate there falls clearly before the solution is extended to all regions.

## Frequently asked questions

### Why not introduce the solution everywhere at once?

A pilot shows at low risk whether the solution works and what side effects it has. Problems can be fixed there more cheaply than after a full roll-out.

### Who decides which solution is implemented?

The team makes a proposal; the champion usually decides together with the process owner, especially when investment or changes in other areas are required.

## Related terms

- [Analyze phase](https://pmdecoder.com/en/glossary/analyze-phase/)
- [Control phase](https://pmdecoder.com/en/glossary/control-phase/)
- [FMEA](https://pmdecoder.com/en/glossary/fmea/)
- [Brainstorming](https://pmdecoder.com/en/glossary/brainstorming/)
- [Y = f(X)](https://pmdecoder.com/en/glossary/y-equals-f-of-x/)

---

Independent information service. Not published, reviewed or authorized by ISO, PMI or the publishers of the other frameworks. The original text is authoritative in each case.
