# Historical data

- Framework: [cross-framework](https://pmdecoder.com/en/framework/general/)
- Topic area: [Resources and estimating](https://pmdecoder.com/en/area/resources-and-estimating/)
- Author: Dennis Hain
- Canonical version: https://pmdecoder.com/en/glossary/historical-data/

## Definition

Historical data are documented actual values and experience from earlier projects: actual durations and effort, costs, defect counts, risks that occurred, change rates or productivity figures. Properly prepared, they form the basis for robust estimates, because they show how long comparable work actually took, not just how long it was supposed to take.

## Equivalents in other frameworks

No equivalents have been recorded for this term yet.

## Distinction

Historical data are figures and facts; lessons learned are the conclusions and recommendations drawn from them. Analogous and parametric estimating methods draw on historical data. Industry benchmarks from studies or databases supplement an organization's own figures, but often fit its own circumstances less closely.

## In practice

An engineering consultancy analyses the time records of its last forty bridge inspections. This shows that report writing takes on average twice as long as calculated, while the on-site inspection is mostly on plan. The consultancy adjusts its costing template and in the following year has significantly fewer contracts that fail to cover their costs. The prerequisite was that hours had been recorded against the same activities for years.

## Frequently asked questions

### Why is historical data so often missing?

Because actual values are not recorded, or are recorded in changing structures, and projects are not evaluated after closure.

### How does historical data become usable?

Through uniform recording structures, a brief post-calculation at the end of the project and a central, searchable repository.

## Related terms

- [Lessons learned](https://pmdecoder.com/en/glossary/lessons-learned/)
- [Project closure](https://pmdecoder.com/en/glossary/project-closure/)
- [Checklist](https://pmdecoder.com/en/glossary/checklist/)

---