# Green Belt

- Framework: [Six Sigma](https://pmdecoder.com/en/framework/six-sigma/)
- Reference: ISO 13053-1:2011
- Edition: ISO 13053-1:2011 (DMAIC methodology)
- Canonical version: https://pmdecoder.com/en/glossary/green-belt/

## Definition

A Green Belt has been trained in the basics of DMAIC and the most common tools, with training shorter than that of a Black Belt. Green Belts remain in their existing role and devote part of their working time to Six Sigma. Two forms of involvement are typical: leading a manageable project in their own area, or working as a team member in a larger project led by a Black Belt and contributing process knowledge there. Because Green Belts know the processes from their own experience, they anchor Six Sigma in line operations and carry the methods into their teams.

## Equivalents in other frameworks

No equivalents have been recorded for this term yet.

## Distinction

The Green Belt differs from the Black Belt in depth of training, project size and time released: a Green Belt works on projects only part of the time, and these usually lie within the Green Belt’s own area. A Yellow Belt, by contrast, has received only an introduction and generally does not lead projects.

## In practice

A shift supervisor at an industrial bakery is trained as a Green Belt. As his project he chooses the high dough loss when switching between products on his line. With support from a Black Belt he measures the losses per changeover for four weeks, finds the main causes and introduces a fixed product sequence. For the rest of the week he continues to work as shift supervisor.

## Frequently asked questions

### How much time does a Green Belt spend on projects?

The organization decides; often it is a fixed share of working time, such as one day a week. Without a binding release from other duties, projects make little progress alongside daily business.

### Can a Green Belt later become a Black Belt?

Yes, that is a common path. It usually requires successful projects and further in-depth training.

## Related terms

- [Black Belt](https://pmdecoder.com/en/glossary/black-belt/)
- [Yellow Belt](https://pmdecoder.com/en/glossary/yellow-belt/)
- [Master Black Belt](https://pmdecoder.com/en/glossary/master-black-belt/)
- [DMAIC](https://pmdecoder.com/en/glossary/dmaic/)
- [Project team](https://pmdecoder.com/en/glossary/project-team/)

---

Independent information service. Not published, reviewed or authorized by ISO, PMI or the publishers of the other frameworks. The original text is authoritative in each case.
