# FMEA

also: Failure mode and effects analysis

- Framework: [cross-framework](https://pmdecoder.com/en/framework/general/)
- Topic area: [Quality](https://pmdecoder.com/en/area/quality/)
- Author: Dennis Hain
- Canonical version: https://pmdecoder.com/en/glossary/fmea/

## Definition

In an FMEA, a cross-functional team examines step by step how a product, component or process could fail, what the consequences would be and what would trigger the failure. Each failure mode is rated for the severity of its effect, the likelihood of occurrence and the likelihood of detection. Traditionally the product of these three ratings served as the risk priority number; more recent automotive industry guidelines instead rank by means of a table of action priorities. Actions are derived from the resulting ranking.

## Equivalents in other frameworks

No equivalents have been recorded for this term yet.

## Distinction

A design FMEA looks at designs, a process FMEA at manufacturing and work processes. The FMEA is preventive, whereas root cause analysis investigates failures that have already occurred. Compared with a general risk analysis, it is considerably more detailed and tailored to technical failure chains.

## In practice

When developing a new coffee machine, the team carries out a design FMEA for the heating circuit. One failure mode reads: thermal fuse does not trip, effect overheating and fire hazard, cause incorrectly rated fuse. Severity is rated ten, occurrence three and detection six. The team decides on a second, independent cut-off and an additional test step in production, after which detection is rated two.

## Frequently asked questions

### When should an FMEA be carried out?

As early as possible, while the design or process can still be changed, and again whenever significant changes are made.

### Who takes part in an FMEA?

Specialists from development, production, quality, service and, where needed, purchasing or suppliers, led by a facilitator experienced in the method.

## Related terms

- [Root cause analysis](https://pmdecoder.com/en/glossary/root-cause-analysis/)
- [Risk identification](https://pmdecoder.com/en/glossary/risk-identification/)
- [Preventive action](https://pmdecoder.com/en/glossary/preventive-action/)
- [Design review](https://pmdecoder.com/en/glossary/design-review/)

---

Independent information service. Not published, reviewed or authorized by ISO, PMI or the publishers of the other frameworks. The original text is authoritative in each case.