# Flow

- Framework: [Kanban](https://pmdecoder.com/en/framework/kanban/)
- Reference: Kanban Guide 2025.5, Abschnitt Why Use Kanban
- Edition: The Kanban Guide, May 2025
- Canonical version: https://pmdecoder.com/en/glossary/flow/

## Definition

In the Kanban Guide, flow refers to the way potential value travels through a system, for example of orders, requests or features through the steps of a workflow. Kanban starts with flow: because workflows exist to create value, value is to be optimized by improving flow. Optimizing here means finding a sound balance between three aims. A workflow is effective when stakeholders get what they need at the time they need it; an efficient one makes the best possible use of the available resources; a predictable one allows reliable forecasts with acceptable uncertainty. How flow is understood in a particular case is recorded by the members in the Definition of Workflow.

## Equivalents in other frameworks

No equivalents have been recorded for this term yet.

## Distinction

In lean management, flow likewise means the smoothest possible movement of work through a value stream, there often relating to materials and production. The term has nothing to do with psychological flow, the state of complete absorption in an activity. The related measures are called flow metrics.

## In practice

An IT service desk finds that incident reports remain open for nine days on average but are actively worked on for only two. The rest of the time they wait for responses from other departments. Instead of enlarging the team, the service desk improves flow: it makes waiting states visible on the board, limits the number of tickets open at the same time and agrees fixed response times with the departments involved.

## Frequently asked questions

### Does better flow mean that everyone is fully utilized?

No. Kanban focuses on the flow of work, not on the utilization of people. Full utilization often leads to queues and slows down flow.

### Which theories does flow in Kanban draw on?

The Kanban Guide mentions, among others, systems thinking, lean principles, queuing theory with batch sizes and queue lengths, variation and quality control.

## Related terms

- [Flow metrics](https://pmdecoder.com/en/glossary/flow-metrics/)
- [Pull system](https://pmdecoder.com/en/glossary/pull-system/)
- [Theory of Constraints](https://pmdecoder.com/en/glossary/theory-of-constraints/)
- [Kaizen](https://pmdecoder.com/en/glossary/kaizen/)

## Differences from other editions

- The Kanban Guide, December 2020: According to this version, an effective workflow delivered what customers want; since 2025 the guide speaks more generally of stakeholders. The guide also pointed out that optimizing something is not automatically the same as pushing it to its maximum.

---

Independent information service. Not published, reviewed or authorized by ISO, PMI or the publishers of the other frameworks. The original text is authoritative in each case.