# Feasibility analysis

- Framework: [PMI / PMBOK Guide](https://pmdecoder.com/en/framework/pmi-pmbok/)
- Reference: PMI Lexicon of Project Management Terms 4.0 (2024)
- Edition: PMBOK Guide – Eighth Edition
- Concept: [Assessment of whether an initiative is feasible](https://pmdecoder.com/en/concept/assessment-of-whether-an-initiative-is-feasible/)
- Topic area: [Initiating](https://pmdecoder.com/en/area/initiating/)
- Canonical version: https://pmdecoder.com/en/glossary/feasibility-analysis/

## Definition

A feasibility analysis examines whether a planned undertaking can realistically be carried out under the given conditions. Depending on the case, it considers technical feasibility, economic viability, organizational and staffing prerequisites, legal requirements and the time frame. The analysis brings out assumptions, constraints and risks and may compare several possible solutions. It typically comes before the decision to start an undertaking and provides information for the business case.

## Equivalents in other frameworks

| Framework | Term there | Relation | Note |
|---|---|---|---|
| cross-framework | [Feasibility study](https://pmdecoder.com/en/glossary/feasibility-study/) | closely related | denotes the analysis in general, the feasibility study its documented result |

## Distinction

The feasibility study in general usage is usually a separate, often commissioned document or preliminary project; the feasibility analysis refers to the examination itself, which may also be shorter and part of other work, hence the close but not exact match. The business case explains whether an undertaking is worthwhile, the feasibility analysis whether it can be done. The two complement each other and are often prepared together.

## In practice

A logistics company is considering converting a warehouse to fully automated order picking. The feasibility analysis checks whether the ceiling height and floor load capacity are sufficient for the system, whether the product range is suitable for robots, whether the conversion is possible during ongoing operations and what investment would be required. The result: technically feasible, but only if the floor is reinforced. These costs are included in the business case.

## Frequently asked questions

### What types of feasibility are examined?

Often technical, economic, organizational, legal and schedule feasibility. Which of these takes priority depends on the undertaking; with a new technology, for example, the technical aspect.

### Can a feasibility analysis produce a negative result?

Yes, and that is a valuable result. Recognizing in good time that an undertaking cannot be carried out spares the organization a failed project and the associated costs.

## Related terms

- [Feasibility study](https://pmdecoder.com/en/glossary/feasibility-study/)
- [Business case](https://pmdecoder.com/en/glossary/business-case-pmi/)
- [Assumption](https://pmdecoder.com/en/glossary/assumption/)
- [Constraint](https://pmdecoder.com/en/glossary/constraint-pmi/)
- [Risk](https://pmdecoder.com/en/glossary/risk-pmi/)

---