# Fast tracking

- Framework: [PMI / PMBOK Guide](https://pmdecoder.com/en/framework/pmi-pmbok/)
- Reference: PMI Lexicon of Project Management Terms 4.0 (2024)
- Edition: PMBOK Guide – Eighth Edition
- Concept: [Shortening through parallel work](https://pmdecoder.com/en/concept/shortening-through-parallel-work/)
- Topic area: [Scheduling](https://pmdecoder.com/en/area/scheduling/)
- Canonical version: https://pmdecoder.com/en/glossary/fast-tracking-pmi/

## Definition

In PMI usage, fast tracking is a schedule compression technique that lets activities or phases which would usually follow one another run in parallel for part of their duration. A successor activity therefore starts before its predecessor is fully complete. This is only possible where the sequence is not mandatory, that is, with discretionary dependencies, and where overlapping actually brings the project end forward, that is, on the critical path. Fast tracking costs little extra at first but increases the risk of rework because work builds on provisional results.

## Equivalents in other frameworks

| Framework | Term there | Relation | Note |
|---|---|---|---|
| cross-framework | [Fast tracking](https://pmdecoder.com/en/glossary/fast-tracking/) | equivalent | — |
| Scrum | — | no counterpart | — |
| Kanban | — | no counterpart | — |

## Classification

- Broader term: [Schedule compression](https://pmdecoder.com/en/glossary/schedule-compression-pmi/)

## Distinction

The cross-framework entry on fast tracking describes the same technique; in PMI terminology it is, like crashing, a form of schedule compression. Crashing shortens the schedule with additional resources and mainly increases cost, whereas fast tracking shortens it through overlap and mainly increases risk.

## In practice

In developing an advertising campaign, production of the commercials was supposed to start only after the script had been fully approved. To keep to the launch date, the production company starts casting and location scouting as soon as the basic idea has been approved. This saves three weeks. When the client drops a scene, a location already booked is no longer needed; the team knowingly accepts the cancellation costs.

## Frequently asked questions

### Which activities are suitable for fast tracking?

Those on the critical path whose sequence is not technically or legally mandatory and where follow-on work can usefully begin with provisional results.

### How can the risk be limited?

By overlapping only part of the duration, exchanging interim results early and agreeing in advance which rework is acceptable if the predecessor work changes.

## Related terms

- [Fast tracking](https://pmdecoder.com/en/glossary/fast-tracking/)
- [Crashing](https://pmdecoder.com/en/glossary/crashing-pmi/)
- [Schedule compression](https://pmdecoder.com/en/glossary/schedule-compression-pmi/)
- [Dependency](https://pmdecoder.com/en/glossary/dependency-pmi/)
- [Rework](https://pmdecoder.com/en/glossary/rework-pmi/)

---