# Epic

- Framework: [PMI / PMBOK Guide](https://pmdecoder.com/en/framework/pmi-pmbok/)
- Reference: PMI Lexicon of Project Management Terms 4.0 (2024)
- Edition: PMBOK Guide – Eighth Edition
- Concept: [Large requirement still to be broken down](https://pmdecoder.com/en/concept/large-requirement-still-to-be-broken-down/)
- Topic area: [Approaches and agility](https://pmdecoder.com/en/area/approaches-and-agility/)
- Canonical version: https://pmdecoder.com/en/glossary/epic-pmi/

## Definition

In PMI’s understanding an epic is a larger, related body of work that serves to organize requirements hierarchically and to lead towards a specific business outcome. An epic is too large to be delivered in a single iteration. It is therefore broken down step by step into smaller units, usually user stories, each of which delivers a usable contribution in its own right and can be estimated. Epics make it easier to keep an overview of a large backlog, to set priorities at a higher level and to track the progress of larger undertakings. They often appear in roadmaps because they bridge strategic objectives and concrete team work.

## Equivalents in other frameworks

| Framework | Term there | Relation | Note |
|---|---|---|---|
| cross-framework | [Epic](https://pmdecoder.com/en/glossary/epic/) | equivalent | — |

## Distinction

The cross-framework term epic refers to the same thing; PMI stresses its organizing function and its link to a business outcome. A user story is small enough for one iteration, an epic is not. In predictive undertakings the role of an epic roughly corresponds to a higher-level element of the work breakdown structure, although an epic is structured by benefit rather than by deliverables.

## In practice

An online retailer plans the epic “Handle returns yourself”. The team breaks it down into stories such as printing a return label, choosing a refund method and tracking the status of a return. The first two stories are delivered in the next iteration; status tracking follows once the connection to the parcel service is in place.

## Frequently asked questions

### How large may an epic be?

There is no fixed limit. An epic should, however, be framed so that its business outcome is clear and it can be delivered within a foreseeable time, for example within a few months.

### Who writes epics?

Usually the person responsible for the product or the requirements, together with stakeholders. The team helps with the breakdown because it is best placed to judge the effort.

## Related terms

- [Epic](https://pmdecoder.com/en/glossary/epic/)
- [User story](https://pmdecoder.com/en/glossary/user-story-pmi/)
- [Story point](https://pmdecoder.com/en/glossary/story-point-pmi/)
- [Roadmap](https://pmdecoder.com/en/glossary/roadmap-pmi/)
- [Product Backlog](https://pmdecoder.com/en/glossary/product-backlog/)

---