# Effort estimation

also: Effort estimate

- Framework: [cross-framework](https://pmdecoder.com/en/framework/general/)
- Topic area: [Resources and estimating](https://pmdecoder.com/en/area/resources-and-estimating/)
- Author: Dennis Hain
- Canonical version: https://pmdecoder.com/en/glossary/effort-estimation/

## Definition

An effort estimate answers, before or during a project, how much work, time or money a task is likely to require. It is based on experience, historical data, consultation with experts or calculation models, and it is the less accurate the less is known about the task. Good estimates therefore state their assumptions and a range alongside the value itself.

## Equivalents in other frameworks

No equivalents have been recorded for this term yet.

## Classification

- Narrower terms: [Analogous estimating](https://pmdecoder.com/en/glossary/analogous-estimating/), [Bottom-up estimating](https://pmdecoder.com/en/glossary/bottom-up-estimating/), [Three-point estimating](https://pmdecoder.com/en/glossary/three-point-estimating/), [Parametric estimating](https://pmdecoder.com/en/glossary/parametric-estimating/)

## Distinction

An estimate is not a commitment: it describes an expectation, whereas budget and deadline are decisions derived from it. A forecast estimates the remaining work in a running project on the basis of measured values. Common techniques are analogous, parametric and bottom-up estimating, as well as three-point estimating, which takes uncertainty explicitly into account.

## In practice

A software company is asked to submit a bid for a customer portal. The first rough estimate, based on a comparison with two similar projects, lies between 250 and 500 person-days. After a requirements workshop, the team breaks the portal down into functions and estimates each one separately; the result is 380 person-days with a range of fifteen per cent up and down. The bid states the assumptions explicitly, such as the number of interfaces.

## Frequently asked questions

### Why are estimates often too low?

Because supporting work such as coordination, testing, documentation and rework is forgotten, and estimators calculate optimistically under pressure of expectations.

### How does an estimate become more accurate?

Through better information, breaking the work down into smaller parts, several independent estimators and comparison with the actual values of earlier projects.

## Related terms

- [Three-point estimating](https://pmdecoder.com/en/glossary/three-point-estimating/)
- [Analogous estimating](https://pmdecoder.com/en/glossary/analogous-estimating/)
- [Parametric estimating](https://pmdecoder.com/en/glossary/parametric-estimating/)
- [Bottom-up estimating](https://pmdecoder.com/en/glossary/bottom-up-estimating/)
- [Work effort](https://pmdecoder.com/en/glossary/work-effort/)
- [Historical data](https://pmdecoder.com/en/glossary/historical-data/)

---

Independent information service. Not published, reviewed or authorized by ISO, PMI or the publishers of the other frameworks. The original text is authoritative in each case.