# Design thinking

- Framework: [PMI / PMBOK Guide](https://pmdecoder.com/en/framework/pmi-pmbok/)
- Reference: PMI Lexicon of Project Management Terms 4.0 (2024)
- Edition: PMBOK Guide – Eighth Edition
- Concept: [User-centred development of solutions](https://pmdecoder.com/en/concept/user-centred-development-of-solutions/)
- Topic area: [Approaches and agility](https://pmdecoder.com/en/area/approaches-and-agility/)
- Canonical version: https://pmdecoder.com/en/glossary/design-thinking-pmi/

## Definition

Design thinking is a human-centred approach to problem solving that PMI associates mainly with clarifying needs and developing solutions. The starting point is a thorough understanding of the people a solution is intended for: their needs, habits and difficulties. From this the actual problem is framed before ideas are collected. Promising ideas are turned into simple prototypes and tried out with real users; the insights lead back to a better understanding or to new ideas. The approach is deliberately repetitive and relies on interdisciplinary teams. In a project context it is especially useful in early stages, when it is still unclear what should be built at all.

## Equivalents in other frameworks

| Framework | Term there | Relation | Note |
|---|---|---|---|
| cross-framework | [Design thinking](https://pmdecoder.com/en/glossary/design-thinking/) | equivalent | — |

## Distinction

The cross-framework term design thinking describes the same approach; PMI adopts it without defining a variant of its own. An adaptive approach controls delivery in cycles, whereas design thinking serves rather to find the right solution beforehand. Individual creativity techniques are building blocks, not the approach as a whole.

## In practice

A health insurer wants to simplify applications for medical aids. Instead of digitizing a form straight away, the project team accompanies insured persons and medical supply stores through real applications. It turns out that the main problem is a lack of feedback on processing status. A paper prototype for status messages is tested with ten insured persons and then added to the project scope.

## Frequently asked questions

### Is design thinking a project management method?

No. It helps to understand problems and find solutions, but it governs neither schedules nor budgets nor responsibilities. It is therefore combined with a project approach.

### Who should take part in design thinking?

A mixed team of specialists from different disciplines and, as early and often as possible, the future users themselves. Without their involvement the approach remains a desk-based assumption.

## Related terms

- [Design thinking](https://pmdecoder.com/en/glossary/design-thinking/)
- [Minimum viable product](https://pmdecoder.com/en/glossary/minimum-viable-product-pmi/)
- [User story](https://pmdecoder.com/en/glossary/user-story-pmi/)
- [Adaptive approach](https://pmdecoder.com/en/glossary/adaptive-approach/)
- [Creativity technique](https://pmdecoder.com/en/glossary/creativity-technique/)

---