# Design of experiments

also: Experimental design · abbr. DoE

- Framework: [cross-framework](https://pmdecoder.com/en/framework/general/)
- Topic area: [Quality](https://pmdecoder.com/en/area/quality/)
- Author: Dennis Hain
- Canonical version: https://pmdecoder.com/en/glossary/design-of-experiments/

## Definition

In design of experiments, the suspected influencing variables, the factors, are changed deliberately at defined levels, and their effect on an output characteristic is measured. An experimental design specifies which combinations are tested and in what order. Full factorial designs test every combination, for example eight runs for three factors at two levels each; fractional factorial designs save runs when higher-order interactions can be neglected. Randomized run order and replication protect against distortion by unnoticed influences. The foundations go back to Ronald A. Fisher, who developed them in the first half of the 20th century for agricultural field trials.

## Equivalents in other frameworks

No equivalents have been recorded for this term yet.

## Distinction

Trial and error on the principle of “one factor at a time” leaves interactions undetected and usually needs more runs. Root cause analysis gathers hypotheses about possible causes; design of experiments tests them specifically through experiments. Analysing existing operating data only reveals correlations; only a planned experiment allows reliable statements about cause and effect.

## In practice

In a development project for a bonding process, the adhesive strength varies widely. The team selects three factors: curing temperature, contact pressure and surface pre-treatment, each at two levels. The eight combinations are run twice each in random order. The analysis shows that pre-treatment has the greatest influence and that temperature matters only on untreated surfaces. With sixteen runs instead of weeks of trial and error, the team fixes the process parameters.

## Frequently asked questions

### How many factors should an experimental design include?

As many as are technically plausible, but not every conceivable one. With many candidates, an economical design is used first to screen out the important factors, which are then examined more closely.

### What is an interaction?

The effect of one factor depends on the level of another. Such effects are easily overlooked if only one factor is changed at a time.

## Related terms

- [Root cause analysis](https://pmdecoder.com/en/glossary/root-cause-analysis/)
- [Process capability](https://pmdecoder.com/en/glossary/process-capability/)
- [Measurement system analysis](https://pmdecoder.com/en/glossary/measurement-system-analysis/)
- [FMEA](https://pmdecoder.com/en/glossary/fmea/)
- [PDCA cycle](https://pmdecoder.com/en/glossary/pdca-cycle/)

---

Independent information service. Not published, reviewed or authorized by ISO, PMI or the publishers of the other frameworks. The original text is authoritative in each case.