# Design for Six Sigma

abbr. DFSS

- Framework: [Six Sigma](https://pmdecoder.com/en/framework/six-sigma/)
- Concept: [Defined framework for how a project proceeds](https://pmdecoder.com/en/concept/defined-framework-for-how-a-project-proceeds/)
- Topic area: [Approaches and agility](https://pmdecoder.com/en/area/approaches-and-agility/)
- Canonical version: https://pmdecoder.com/en/glossary/design-for-six-sigma/

## Definition

Design for Six Sigma, DFSS for short, applies Six Sigma thinking to development. Instead of improving an existing process, a product, service or process is designed so that it meets customer requirements from the outset with little variation. The starting point is the customer requirements that have been gathered and the critical-to-quality characteristics derived from them. A widely used cycle is DMADV: Define, Measure, Analyze, Design and Verify. There are also other variants with different phase names. Typical tools are methods for translating customer wishes into technical characteristics, risk analyses of the design and design of experiments.

## Equivalents in other frameworks

| Framework | Term there | Relation | Note |
|---|---|---|---|
| PMI / PMBOK Guide | [Methodology](https://pmdecoder.com/en/glossary/methodology/) | partially overlapping | Special form of a methodology for developing new products and processes, usually following the DMADV cycle. |
| cross-framework | [Process model](https://pmdecoder.com/en/glossary/process-model/) | partially overlapping | Special form of a methodology for developing new products and processes, usually following the DMADV cycle. |

## Other terms

- DFSS (abbreviation)
- DMADV (related, not equivalent): common cycle within DFSS

## Distinction

DMAIC presupposes that a process exists and can be measured; DFSS is used when something new is being created or when a process is so fundamentally unsuitable that improvement is not enough. DFSS shares its customer focus with design thinking but relies more on measurable characteristics and statistical assurance.

## In practice

A utility introduces a new online application for house connections. Using DFSS, the team first establishes what builders and installers need and derives characteristics from this, such as no more than five days until a binding appointment is confirmed. The design is checked with a risk analysis, tested in a trial run and released only after the target values have been demonstrated.

## Frequently asked questions

### What does DMADV stand for?

Define, Measure, Analyze, Design and Verify. The first three phases resemble DMAIC but relate to requirements and design alternatives rather than to a running process.

### Is DFSS only intended for industrial products?

No. It is also used for services, administrative procedures and software, wherever something new with measurable requirements is being created.

## Related terms

- [DMAIC](https://pmdecoder.com/en/glossary/dmaic/)
- [Voice of the Customer](https://pmdecoder.com/en/glossary/voice-of-the-customer/)
- [Critical to Quality](https://pmdecoder.com/en/glossary/critical-to-quality/)
- [Design thinking](https://pmdecoder.com/en/glossary/design-thinking/)
- [FMEA](https://pmdecoder.com/en/glossary/fmea/)

---