# Deliverable

- Framework: [ISO 21506](https://pmdecoder.com/en/framework/iso-21506/)
- Reference: ISO 21506:2024, 3.20
- Edition: ISO 21506:2024
- Concept: [Verifiable project result](https://pmdecoder.com/en/concept/verifiable-project-result/)
- Topic area: [Scope and requirements](https://pmdecoder.com/en/area/scope-and-requirements/)
- Author: Dennis Hain
- Canonical version: https://pmdecoder.com/en/glossary/deliverable/

## Definition

A deliverable is any clearly described result that a project or part of it must produce. It can be a product, a facility, a document such as a concept or test report, a software release or a service provided, such as training. Deliverables can be verified and form the basis for acceptance, progress measurement and often payments.

## Equivalents in other frameworks

| Framework | Term there | Relation | Note |
|---|---|---|---|
| PMI / PMBOK Guide | [Deliverable](https://pmdecoder.com/en/glossary/deliverable-pmi/) | equivalent | — |
| Scrum | [Increment](https://pmdecoder.com/en/glossary/increment/) | partially overlapping | usable step towards the Product Goal that includes all previous Increments; not every deliverable is an Increment |

## Distinction

A deliverable is a result, an activity the work that leads to it. A milestone marks a point in time by which a deliverable often has to be available, but is not itself a result. A distinction is made between external deliverables for the client and internal ones that are only needed within the project, such as a test concept.

## In practice

In a contract for a website redesign, the agency lists twelve deliverables, including a design concept, a prototype, the finished website and editorial training. For each one, the contract describes in what form it is handed over and how acceptance is determined. When the client also expects a style guide, it can quickly be shown that this was not agreed; both sides negotiate it as an additional order.

## Frequently asked questions

### How do you describe a deliverable well?

With its name, content, form, quality characteristics, date, recipient and the criteria by which it will be accepted.

### Are project management documents deliverables too?

Yes, if they have been agreed, such as a final report. Many contracts, however, treat them as internal results without separate acceptance.

## Related terms

- [Formal acceptance](https://pmdecoder.com/en/glossary/formal-acceptance/)
- [Acceptance criteria](https://pmdecoder.com/en/glossary/acceptance-criteria/)
- [Milestone](https://pmdecoder.com/en/glossary/milestone/)
- [Work breakdown structure](https://pmdecoder.com/en/glossary/work-breakdown-structure/)
- [Statement of work](https://pmdecoder.com/en/glossary/statement-of-work/)

---