# Deliverable

- Framework: [PMI / PMBOK Guide](https://pmdecoder.com/en/framework/pmi-pmbok/)
- Reference: PMI Lexicon of Project Management Terms 4.0 (2024)
- Edition: PMBOK Guide – Eighth Edition
- Concept: [Verifiable project result](https://pmdecoder.com/en/concept/verifiable-project-result/)
- Topic area: [Scope and requirements](https://pmdecoder.com/en/area/scope-and-requirements/)
- Canonical version: https://pmdecoder.com/en/glossary/deliverable-pmi/

## Definition

In PMI usage, a deliverable is any unique, verifiable product, result or other capability to provide a service whose creation is necessary for a process, phase or project to be completed. Deliverables may be tangible, such as a plant or a piece of software, or intangible, such as a concept, a report or a trained workforce. They are planned in the work breakdown structure, checked for correctness in quality control and then submitted to the customer or sponsor for formal acceptance. Besides results for the customer, there are also deliverables for managing the project, such as plans and reports.

## Equivalents in other frameworks

| Framework | Term there | Relation | Note |
|---|---|---|---|
| ISO 21506 | [Deliverable](https://pmdecoder.com/en/glossary/deliverable/) | equivalent | — |
| Scrum | [Increment](https://pmdecoder.com/en/glossary/increment/) | partially overlapping | usable step towards the Product Goal that includes all previous Increments; not every deliverable is an Increment |

## Distinction

The term corresponds to the deliverable in the standard. The increment in Scrum is a special case: a usable partial result at the end of a sprint. A deliverable is the result itself, an outcome the change that occurs through its use, and benefits the resulting advantage. Output refers more generally to the result of a process and need not be a deliverable for the customer.

## In practice

A project to renew the lighting in a school has the following deliverables: a lighting concept, the installed LED luminaires in all rooms, a measurement record of illuminance levels and a briefing for the caretaker. Each deliverable is assigned to a work package and has acceptance criteria. Only when the school authority has accepted all of them is the project considered complete in terms of content.

## Frequently asked questions

### What is the difference between verified and accepted deliverables?

A deliverable is verified when the project team has established in quality control that it meets the specifications. It is accepted when the customer or sponsor has formally approved it.

### Are project documents also deliverables?

Yes, if a process or phase cannot be completed without them. A distinction is therefore often made between deliverables for the customer and those for project management.

## Related terms

- [Deliverable](https://pmdecoder.com/en/glossary/deliverable/)
- [Increment](https://pmdecoder.com/en/glossary/increment/)
- [Acceptance criteria](https://pmdecoder.com/en/glossary/acceptance-criteria-pmi/)
- [Work package](https://pmdecoder.com/en/glossary/work-package-pmi/)
- [Verification](https://pmdecoder.com/en/glossary/verification-pmi/)
- [Output](https://pmdecoder.com/en/glossary/output-pmi/)

---