# Definition of Done

abbr. DoD

- Framework: [Scrum](https://pmdecoder.com/en/framework/scrum/)
- Reference: Scrum Guide 2020, Abschnitt Commitment: Definition of Done
- Edition: Scrum Guide 2020
- Concept: [Criteria for a finished result](https://pmdecoder.com/en/concept/criteria-for-a-finished-result/)
- Topic area: [Scope and requirements](https://pmdecoder.com/en/area/scope-and-requirements/)
- Author: Dennis Hain
- Canonical version: https://pmdecoder.com/en/glossary/definition-of-done/

## Definition

The Definition of Done determines when work on the product counts as finished. It describes in binding terms which quality requirements a result must meet and is the commitment that belongs to the Increment. As soon as a Product Backlog item fulfils all criteria, it counts as an Increment. Until then, it may be neither released nor presented in the Sprint Review; it goes back into the Product Backlog instead. If the organization specifies a Definition of Done, it applies to all Scrum Teams as a minimum standard; otherwise the team sets a suitable one. If several teams work on one product, the same Definition of Done applies to all of them.

## Equivalents in other frameworks

| Framework | Term there | Relation | Note |
|---|---|---|---|
| PMI / PMBOK Guide | [Acceptance criteria](https://pmdecoder.com/en/glossary/acceptance-criteria-pmi/) | partially overlapping | serves as the quality standard for every Increment of a product, not for an individual deliverable |
| PM² | [Deliverables Acceptance Management Plan](https://pmdecoder.com/en/glossary/deliverables-acceptance-management-plan/) | partially overlapping | plan that, in addition to the criteria, also defines the steps, responsibilities and dates of acceptance |
| cross-framework | [Acceptance criteria](https://pmdecoder.com/en/glossary/acceptance-criteria/) | partially overlapping | serves as the quality standard for every Increment of a product, not for an individual deliverable |

## Distinction

Acceptance criteria apply to a single deliverable or item and describe what it must do. The Definition of Done, by contrast, applies equally to all items and describes quality characteristics such as tested, documented and releasable. The Definition of Ready, which some teams use in addition, is not part of the Scrum Guide.

## In practice

The Definition of Done of a team that looks after a university website comprises seven points: the editorial team has approved the content, all pages are accessible, texts are available in German and English, loading time stays below two seconds, changes are described in the version history, automated tests pass without errors, and the data protection team has reviewed new forms. A degree programme page without an English version therefore does not count as finished.

## Frequently asked questions

### Can the Definition of Done change?

Yes. Teams often sharpen it in the Sprint Retrospective, for example when defects show that a quality criterion is missing. A standard set by the organization remains the lower limit.

### What happens to work that does not meet the Definition of Done?

It is not part of the Increment and is not presented in the Sprint Review. The corresponding item goes back to the Product Backlog and is reordered there.

## Related terms

- [Increment](https://pmdecoder.com/en/glossary/increment/)
- [Sprint Retrospective](https://pmdecoder.com/en/glossary/sprint-retrospective/)
- [Acceptance criteria](https://pmdecoder.com/en/glossary/acceptance-criteria/)
- [Quality](https://pmdecoder.com/en/glossary/quality/)

## Differences from other editions

- Scrum Guide 2017: The name was Definition of “Done”, with quotation marks. It was covered in the section on the transparency of the artifacts and was not yet a commitment attached to the Increment.

---