# Customer requirements specification

also: User requirements specification

- Framework: [cross-framework](https://pmdecoder.com/en/framework/general/)
- Topic area: [Scope and requirements](https://pmdecoder.com/en/area/scope-and-requirements/)
- Author: Dennis Hain
- Canonical version: https://pmdecoder.com/en/glossary/customer-requirements-specification/

## Definition

In the customer requirements specification (Lastenheft), the client sets out what it expects from a delivery or service. It describes the initial situation and objectives, functional and non-functional requirements, constraints, interfaces, quantities, dates and acceptance criteria, as far as possible without prescribing the solution. In Germany, DIN 69901-5 and the guideline VDI 2519 describe the term and its structure.

## Equivalents in other frameworks

No equivalents have been recorded for this term yet.

## Distinction

The customer requirements specification answers the question of what, the functional specification (Pflichtenheft) the question of how: in it, the contractor describes how it intends to meet the requirements. A statement of work in procurement procedures can be based on a customer requirements specification or replace it. In English-speaking countries, the closest equivalent is a requirements specification.

## In practice

A mechanical engineering company wants to procure an assembly cell for gearboxes. The customer requirements specification states the cycle time, number of variants, available floor space, connected loads, safety requirements, the interface to the master control system and the criteria for the trial run. How the cell is built is left open. Three suppliers submit offers based on it, two with robots and one with semi-automated workstations, which can now be compared.

## Frequently asked questions

### Who writes the customer requirements specification?

The client, usually together with the future users and specialists. External support is possible, but responsibility for the content remains with the client.

### How detailed should a customer requirements specification be?

Precise enough for suppliers to understand the requirements unambiguously and be able to submit an offer, without already stipulating a particular solution.

## Related terms

- [Functional specification](https://pmdecoder.com/en/glossary/functional-specification/)
- [Requirement](https://pmdecoder.com/en/glossary/requirement/)
- [Statement of work](https://pmdecoder.com/en/glossary/statement-of-work/)
- [Client](https://pmdecoder.com/en/glossary/client/)

---

Independent information service. Not published, reviewed or authorized by ISO, PMI or the publishers of the other frameworks. The original text is authoritative in each case.
