# Control plan

- Framework: [Six Sigma](https://pmdecoder.com/en/framework/six-sigma/)
- Reference: ISO 13053-2:2011
- Edition: ISO 13053-2:2011 (tools and techniques)
- Concept: [Setting quality objectives and checks](https://pmdecoder.com/en/concept/setting-quality-objectives-and-checks/)
- Topic area: [Quality](https://pmdecoder.com/en/area/quality/)
- Canonical version: https://pmdecoder.com/en/glossary/control-plan/

## Definition

A control plan describes how a process is kept in the state achieved after an improvement. It is usually kept as a table and, for each monitored measure, states the characteristic, the measurement method, sample size and frequency, limits or target values, the person responsible and the intended reaction to deviations. Both output measures and the most important influencing factors identified as decisive in the analysis are monitored. The plan is created in the Control phase of a DMAIC project and is handed over to the process owner. German translations vary.

## Equivalents in other frameworks

| Framework | Term there | Relation | Note |
|---|---|---|---|
| PMI / PMBOK Guide | [Quality management plan](https://pmdecoder.com/en/glossary/quality-management-plan/) | partially overlapping | denotes the document in which the result of quality planning is recorded |
| PRINCE2 | [Quality Management Approach](https://pmdecoder.com/en/glossary/quality-management-approach/) | partially overlapping | Defines standards, procedures and responsibilities; the quality criteria of individual products are in the product descriptions. |
| cross-framework | [Quality planning](https://pmdecoder.com/en/glossary/quality-planning/) | partially overlapping | Sets monitoring and reactions for a running process after the project, not quality assurance of the project results. |

## Distinction

Quality planning sets out for a project how the quality of its results will be assured. A control plan, by contrast, applies to a running process and its operation after the project. A control chart is a tool that the control plan may call for; the plan additionally sets responsibilities and reactions.

## In practice

After a project on billing errors, an energy supplier includes three measures in the control plan: the share of incorrect bills, evaluated monthly, the time taken to transmit meter readings, measured daily, and the number of blocked bills. If transmission time exceeds two days, the system notifies the team leader, who clarifies the cause within a week.

## Frequently asked questions

### Who is responsible for the control plan?

The project team drafts it; after handover the process owner is responsible for applying it. The process owner should therefore help to shape it.

### When is a control plan changed?

When the process changes, a measure loses its significance or reactions prove ineffective. It is a living document, not a one-off project report.

## Related terms

- [Control phase](https://pmdecoder.com/en/glossary/control-phase/)
- [Control chart](https://pmdecoder.com/en/glossary/control-chart/)
- [Quality control](https://pmdecoder.com/en/glossary/quality-control/)
- [Quality planning](https://pmdecoder.com/en/glossary/quality-planning/)
- [Corrective action](https://pmdecoder.com/en/glossary/corrective-action/)

---