# Control phase

- Framework: [Six Sigma](https://pmdecoder.com/en/framework/six-sigma/)
- Reference: ISO 13053-1:2011
- Edition: ISO 13053-1:2011 (DMAIC methodology)
- Concept: [Closing stage of a project](https://pmdecoder.com/en/concept/closing-stage-of-a-project/)
- Topic area: [Closing](https://pmdecoder.com/en/area/closing/)
- Canonical version: https://pmdecoder.com/en/glossary/control-phase/

## Definition

In the Control phase the team ensures that the improvement remains in place after the project ends. The new procedures are documented as the standard, the people involved are trained, and a control plan sets out which measures continue to be monitored, how often and who does what in case of deviations. Control charts are often introduced for important measures. After an observation period, the team checks whether results are stable and the financial benefit is materializing. The process owner then takes over monitoring, the team records its lessons, and the final tollgate closes the project.

## Equivalents in other frameworks

| Framework | Term there | Relation | Note |
|---|---|---|---|
| PRINCE2 | [Closing a project](https://pmdecoder.com/en/glossary/closing-a-project/) | closely related | Process within the final stage rather than a stage of its own; also used for premature closure. |
| PM² | [Closing Phase](https://pmdecoder.com/en/glossary/closing-phase-pm2/) | closely related | fixed phase after the Ready for Closing phase gate, with the Project-End Report |
| cross-framework | [Project closure](https://pmdecoder.com/en/glossary/project-closure/) | closely related | Closes the project, but focuses on securing the improvement for the long term and handing it over to the process owner. |
| Scrum | — | no counterpart | — |
| Kanban | — | no counterpart | — |

## Classification

- Broader term: [DMAIC](https://pmdecoder.com/en/glossary/dmaic/)

## Distinction

The Control phase includes project closure but goes further: its focus is the lasting management of the improved process, not just the orderly ending of the project. “Control” here means steering and securing the process, not checking in the sense of an inspection.

## In practice

After introducing a new checklist for claims, an insurer’s team decides that lead time will be evaluated weekly. If it exceeds twelve days three weeks in a row, the team leader investigates the cause. After three stable months the Black Belt hands monitoring over to the head of department, and the champion confirms closure.

## Frequently asked questions

### Why is the Control phase so important?

Without safeguards, processes often fall back into old habits once the project team turns to other tasks. The phase turns the improvement into normal operation.

### How long is the process observed after introduction?

The organization and project decide. Observation should be long enough to include typical fluctuations such as month-end or seasonal peaks.

## Related terms

- [Control plan](https://pmdecoder.com/en/glossary/control-plan/)
- [Control chart](https://pmdecoder.com/en/glossary/control-chart/)
- [Quality control](https://pmdecoder.com/en/glossary/quality-control/)
- [Project closure](https://pmdecoder.com/en/glossary/project-closure/)
- [Improve phase](https://pmdecoder.com/en/glossary/improve-phase/)

---

Independent information service. Not published, reviewed or authorized by ISO, PMI or the publishers of the other frameworks. The original text is authoritative in each case.
