# Control limit

also: Action limit

- Framework: [cross-framework](https://pmdecoder.com/en/framework/general/)
- Topic area: [Quality](https://pmdecoder.com/en/area/quality/)
- Author: Dennis Hain
- Canonical version: https://pmdecoder.com/en/glossary/control-limit/

## Definition

Control limits are determined from the data of a stable process and usually lie three standard deviations above and below the mean. A value outside this range is very unlikely in an undisturbed process and is therefore a signal to look for a special cause and to intervene if necessary. Some control charts also contain narrower warning limits that call for increased attention.

## Equivalents in other frameworks

No equivalents have been recorded for this term yet.

## Distinction

The specification limit comes from outside, from the requirements; the control limit comes from the process itself. Warning limits lie inside the control limits and do not yet lead to intervention. A fixed limit value, such as a statutory maximum, is also a requirement and not a statistical control limit.

## In practice

In a validation project, a laboratory monitors the temperature of an incubator. From two weeks of measurement data it calculates a centre line of 37.0 degrees and control limits of 36.6 and 37.4 degrees. When 37.5 degrees is measured one morning, the incubator is checked immediately. The cause is a door that no longer closes properly after cleaning. Without the control limit, the deviation would only have been noticed at the prescribed upper limit.

## Frequently asked questions

### Why three standard deviations?

Because in a stable process a value then only very rarely falls outside by chance, so false alarms are rare, while real changes are usually noticed quickly.

### When do control limits have to be recalculated?

When the process has been changed deliberately, for example through new machines or methods, and a new stable state has been established.

## Related terms

- [Control chart](https://pmdecoder.com/en/glossary/control-chart/)
- [Specification limit](https://pmdecoder.com/en/glossary/specification-limit/)
- [Special cause](https://pmdecoder.com/en/glossary/special-cause/)

---

Independent information service. Not published, reviewed or authorized by ISO, PMI or the publishers of the other frameworks. The original text is authoritative in each case.