# Competence element: Scope

- Framework: [IPMA / ICB](https://pmdecoder.com/en/framework/ipma/)
- Reference: IPMA ICB 4.0, Abschnitt 4.5.3
- Edition: IPMA Individual Competence Baseline 4.0
- Canonical version: https://pmdecoder.com/en/glossary/competence-element-scope/

## Definition

This competence element describes how someone defines and controls the content of a project. The scope comprises the results, outputs and benefits of a project and, consequently, the work required to produce them. Equally important is the other side: recording what does not belong to the project. This establishes the boundaries of the undertaking. The four key competence indicators include defining deliverables, structuring the scope, creating work packages and keeping the currently valid state of the scope and its changes traceable through configuration management. As tools, the ICB names among others the work breakdown structure, the product breakdown structure and the work package description.

## Equivalents in other frameworks

No equivalents have been recorded for this term yet.

## Classification

- Broader term: Practice

## Distinction

Project scope and deliverable are the subject matter; the competence element is the ability to define and control them. Scope creep, the gradual growth of the scope, is one of the problems it is meant to prevent. The chronological sequence of the work is covered by the competence element Time.

## In practice

For the introduction of an intranet, the project manager agrees with the sponsor that news, the staff directory and the forms library are included, but not the migration of the email systems. He breaks the scope down in a work breakdown structure and describes each work package with its result and those responsible. When the communications department additionally asks for a staff magazine, he refers to the agreed exclusions and initiates a change request.

## Frequently asked questions

### Why are exclusions so important?

Because unspoken expectations lead to disputes later. Recording what does not belong to the project sets clear boundaries for planning, budget and acceptance.

### What does configuration management have to do with scope?

It records which state of the scope is valid and how it has changed. This keeps it traceable which deliverables have been agreed in which version.

## Related terms

- [Project scope](https://pmdecoder.com/en/glossary/project-scope/)
- [Deliverable](https://pmdecoder.com/en/glossary/deliverable/)
- [Work breakdown structure](https://pmdecoder.com/en/glossary/work-breakdown-structure/)
- [Scope creep](https://pmdecoder.com/en/glossary/scope-creep/)

---