# Competence element: Resourcefulness

- Framework: [IPMA / ICB](https://pmdecoder.com/en/framework/ipma/)
- Reference: IPMA ICB 4.0, Abschnitt 4.4.8
- Edition: IPMA Individual Competence Baseline 4.0
- Canonical version: https://pmdecoder.com/en/glossary/competence-element-resourcefulness/

## Definition

In the ICB, resourcefulness stands for inventiveness in dealing with challenges; the German edition calls it Vielseitigkeit (versatility). The competence element describes the ability to capture, examine and weigh problems using various techniques and ways of thinking and to look for alternatives. This often calls for original thinking and stimulates the creativity of individuals and of the whole team. The ability is particularly needed in situations of uncertainty, change, constraints and pressure. The five key competence indicators include creating an atmosphere in which openness and creativity are possible, thinking conceptually and analytically, applying creative techniques and viewing the project holistically together with its environment.

## Equivalents in other frameworks

No equivalents have been recorded for this term yet.

## Classification

- Broader term: People

## Distinction

A creativity technique such as brainstorming is a tool; the competence element is the ability to use such tools appropriately and to combine them with analytical methods. The English name Resourcefulness makes clearer than the German one that the element is about inventiveness and not about wide-ranging interests.

## In practice

A few weeks before a trade fair, the supplier of the display for a new prototype drops out. Instead of just looking for a replacement supplier, the project manager has the team collect options in a short workshop: an existing display from another product, a software-only demonstration or a loan device. The team assesses the options by effort, effect on visitors and risk. In the end, the prototype is shown with a modified display from the pre-series.

## Frequently asked questions

### Why is the element called Vielseitigkeit in German?

It is the German name for resourcefulness. It refers to the ability to draw flexibly on different ways of thinking and approaches when solving problems.

### Which methods does the ICB name?

Among others, brainstorming, lateral and systems thinking, scenario, SWOT and PESTEL analyses, as well as techniques for problem-solving and innovation.

## Related terms

- [Creativity technique](https://pmdecoder.com/en/glossary/creativity-technique/)
- [Brainstorming](https://pmdecoder.com/en/glossary/brainstorming/)
- [SWOT analysis](https://pmdecoder.com/en/glossary/swot-analysis/)
- [Design thinking](https://pmdecoder.com/en/glossary/design-thinking/)

---

Independent information service. Not published, reviewed or authorized by ISO, PMI or the publishers of the other frameworks. The original text is authoritative in each case.
