# Common cause

also: Chance cause, Random cause

- Framework: [cross-framework](https://pmdecoder.com/en/framework/general/)
- Topic area: [Quality](https://pmdecoder.com/en/area/quality/)
- Author: Dennis Hain
- Canonical version: https://pmdecoder.com/en/glossary/common-cause/

## Definition

Common causes are the many small influences that are always at work in a process: slight fluctuations in material, room temperature, tool wear or handling. Individually they are hardly detectable; together they determine the typical variation of a stable process. If only common causes are at work, a process is considered to be in statistical control; its results are predictable within a known range.

## Equivalents in other frameworks

No equivalents have been recorded for this term yet.

## Distinction

Special causes are individual, identifiable disturbances that occur in addition. Common causes cannot be removed by intervening on individual results, only by changing the process itself, for example through better machines or tighter material tolerances. According to a well-known observation by W. Edwards Deming, anyone who reacts to random variation as if it were a disturbance tends to make the process worse.

## In practice

In a call centre project, the daily average waiting time fluctuates between 40 and 70 seconds. Management wants to hold talks with the team after every day with a long waiting time. The project consultant uses a control chart to show that all values lie within the limits and that the fluctuation stems from common causes. Instead of holding individual talks, the project improves staff scheduling, and the range falls to 35 to 50 seconds.

## Frequently asked questions

### How can common causes be recognized?

From a control chart whose values are distributed randomly and without conspicuous patterns within the control limits.

### Who is responsible for common causes?

Usually management, because they lie in the system, for example in machines, material or processes, and cannot be remedied by individual employees.

## Related terms

- [Special cause](https://pmdecoder.com/en/glossary/special-cause/)
- [Control chart](https://pmdecoder.com/en/glossary/control-chart/)
- [Control limit](https://pmdecoder.com/en/glossary/control-limit/)

---

Independent information service. Not published, reviewed or authorized by ISO, PMI or the publishers of the other frameworks. The original text is authoritative in each case.