# Bottom-up estimating

- Framework: [PMI / PMBOK Guide](https://pmdecoder.com/en/framework/pmi-pmbok/)
- Reference: PMI Lexicon of Project Management Terms 4.0 (2024)
- Edition: PMBOK Guide – Eighth Edition
- Concept: [Estimating from the bottom up](https://pmdecoder.com/en/concept/estimating-from-the-bottom-up/)
- Topic area: [Resources and estimating](https://pmdecoder.com/en/area/resources-and-estimating/)
- Canonical version: https://pmdecoder.com/en/glossary/bottom-up-estimating-pmi/

## Definition

In PMI’s understanding, bottom-up estimating first estimates each piece of work at the lowest sensible level, usually work packages or activities. The individual values are then rolled up through the levels of the work breakdown structure until figures for sub-projects and for the project as a whole emerge. This requires the scope to be sufficiently decomposed and understood. The technique is regarded as more accurate than rough overall estimates, because estimating errors in individual parts partly cancel out and the estimators know the work well. It is, however, time-consuming, and missing work packages or dependencies between parts are easily overlooked. Its accuracy therefore also depends on the completeness of the work breakdown structure.

## Equivalents in other frameworks

| Framework | Term there | Relation | Note |
|---|---|---|---|
| cross-framework | [Bottom-up estimating](https://pmdecoder.com/en/glossary/bottom-up-estimating/) | equivalent | — |

## Distinction

In PMI, bottom-up estimating names the same technique as the cross-framework term Bottom-up-Schätzung. Analogous estimating, by contrast, works top-down with an overall comparison. The breaking down of the scope itself is called decomposition in PMI; bottom-up estimating builds on its result.

## In practice

For the development of a customer portal app, the team has defined 42 work packages. The people responsible estimate their effort in person-days, and the project manager adds costs for licences and test devices. The total comes to 610 person-days. A comparison with an earlier analogous estimate of 500 days shows that accessibility testing appears as a separate work package for the first time; this makes the difference traceable.

## Frequently asked questions

### How accurate is bottom-up estimating?

It is one of the more accurate techniques, provided the work breakdown structure is complete and the estimators know the work. Systematic errors, such as consistently optimistic assumptions, do not cancel out, however, but add up.

### Who should provide the individual estimates?

Ideally the people who will later do the work or be responsible for it. They know the difficulties and dependencies best and are more likely to commit to the result.

## Related terms

- [Bottom-up estimating](https://pmdecoder.com/en/glossary/bottom-up-estimating/)
- [Work breakdown structure](https://pmdecoder.com/en/glossary/work-breakdown-structure-pmi/)
- [Work package](https://pmdecoder.com/en/glossary/work-package-pmi/)
- [Analogous estimating](https://pmdecoder.com/en/glossary/analogous-estimating-pmi/)
- [Decomposition](https://pmdecoder.com/en/glossary/decomposition-pmi/)

---