# Bill of quantities

abbr. BoQ

- Framework: [cross-framework](https://pmdecoder.com/en/framework/general/)
- Topic area: [Contracts and procurement](https://pmdecoder.com/en/area/contracts-and-procurement/)
- Author: Dennis Hain
- Canonical version: https://pmdecoder.com/en/glossary/bill-of-quantities/

## Definition

A bill of quantities (Leistungsverzeichnis) breaks construction work or comparable work down into individual items, for example “sand-lime brick masonry, 17.5 centimetres, 240 square metres”. Each item describes the type and quality of the work and states the quantity and unit. Bidders enter unit rates, from which the bid price is derived. In Germany, the GAEB format is widely used for electronic exchange.

## Equivalents in other frameworks

No equivalents have been recorded for this term yet.

## Distinction

The statement of work (Leistungsbeschreibung) is the generic term; the bill of quantities is its structured, item-by-item form. A performance specification (funktionale Leistungsbeschreibung) states only requirements and leaves the items to the bidder. The bill of materials lists the components of a product, the bill of quantities the work to be carried out.

## In practice

For the refurbishment of a sports hall, the architects draw up bills of quantities for each trade. In the floor covering trade, the item for removing the old covering is initially missing. A bidder points this out in a query, and all bidders receive an addendum. Had the item remained missing, it would later have been billed as a change order, usually at higher prices than under competition.

## Frequently asked questions

### Who prepares the bill of quantities?

Usually the design office on behalf of the client, based on the detailed design and quantity take-offs.

### What happens if quantities differ?

Under unit-price contracts, billing is based on the quantities actually carried out. How larger deviations are to be handled is governed by the contract.

## Related terms

- [Statement of work](https://pmdecoder.com/en/glossary/statement-of-work/)
- [Tendering](https://pmdecoder.com/en/glossary/tendering/)
- [Cost estimation](https://pmdecoder.com/en/glossary/cost-estimation/)

---

Independent information service. Not published, reviewed or authorized by ISO, PMI or the publishers of the other frameworks. The original text is authoritative in each case.