# 5 Whys

also: 5 Why analysis

- Framework: [cross-framework](https://pmdecoder.com/en/framework/general/)
- Concept: [Finding the underlying cause of a problem](https://pmdecoder.com/en/concept/finding-the-underlying-cause-of-a-problem/)
- Topic area: [Quality](https://pmdecoder.com/en/area/quality/)
- Author: Dennis Hain
- Canonical version: https://pmdecoder.com/en/glossary/5-whys/

## Definition

The 5 Whys technique starts with a concise, factual description of the problem. Each answer is followed by the question why it happened, so that a chain of causes emerges. The number five is a guideline: one stops when a cause has been reached that can be eliminated permanently by an action, often a gap in a procedure, a rule or a check. Each answer should be supported by observation or data rather than merely assumed. The technique originated at Toyota and is an established part of lean approaches and improvement projects.

## Equivalents in other frameworks

| Framework | Term there | Relation | Note |
|---|---|---|---|
| PMI / PMBOK Guide | [Root cause analysis](https://pmdecoder.com/en/glossary/root-cause-analysis-pmi/) | partially overlapping | A single tool of root cause analysis, not the whole approach. |

## Distinction

Root cause analysis is the umbrella term for the approach, and the 5 Whys technique is one of its simplest tools. The Ishikawa diagram collects many possible causes in breadth, whereas the 5 Whys follow one cause in depth; the two are often combined. For complex problems with several interacting causes a single chain of questions reaches its limits, and data analysis or experiments become necessary.

## In practice

In a construction project, installation of the facade is delayed by a week. First answer: the elements arrived late. Why? The manufacturer produced them later. Why? Approval of the shop drawings was missing. Why? The drawings had been with the architect for ten days without anyone following up. Why? There were no deadlines and no tracking for approvals. The project manager introduces an approval list with deadlines and reviews it at every site meeting.

## Frequently asked questions

### Do you have to ask exactly five times?

No. Some chains end after three questions, others need more. What matters is that the chain ends with a cause whose removal prevents the problem from recurring.

### What mistakes are common with the 5 Whys?

Answers are based on assumptions rather than facts, the chain ends with a person instead of a process, or it is overlooked that there are several causes, each of which would need to be followed up separately.

## Related terms

- [Root cause analysis](https://pmdecoder.com/en/glossary/root-cause-analysis/)
- [Pareto chart](https://pmdecoder.com/en/glossary/pareto-chart/)
- [Special cause](https://pmdecoder.com/en/glossary/special-cause/)
- [Corrective action](https://pmdecoder.com/en/glossary/corrective-action/)
- [Kaizen](https://pmdecoder.com/en/glossary/kaizen/)

---

Independent information service. Not published, reviewed or authorized by ISO, PMI or the publishers of the other frameworks. The original text is authoritative in each case.